Client portal loginClient login WhatsApp

From floor planto one container

Two weeks for the design, two to four weeks for production and consolidation depending on the project, four to six weeks at sea. Most whole-home projects take four to five months from the first call.

06How we workOne team, from design to delivery

From visionto reality

One partner from the first sketch to the last crate. We design it, source it at factory prices, check every piece and ship the whole interior in one container.

  1. 01

    Share your plan

    Send a floor plan, a few photos or a simple room list. We start by understanding the space, the budget and the timeline.

    • Floor plan
    • Room list
  2. 02

    Design and quote

    Concept, 3D and a VR walk-through of every room, then the technical set. Two weeks, with a full budget for design and supply.

    • Two weeks
    • 3D & VR
  3. 03

    Sourcing and QC

    Every item is matched to a real product at factory prices in Foshan, then checked, photographed and signed off before it is wrapped.

    • Factory prices
    • Per-item QC
  4. 04

    One container

    Consolidated in our own 10 000 m² distribution centre, export-packed by room and shipped with one manifest, with installation drawings to unpack by.

    • Door to door
    • One manifest